LAMBEAU FIELD
Legendary Home of the Green Bay Packers
PROJECT OVERVIEW

Project: Lambeau Field, WI
Description: NFL Stadium
Team Affiliate: Green Bay Packers
Size/Sq Ft: Large/2.1Million SqFt
Seating capacity: 80,750
Completed: 2013
Scope: Audio, Broadcast, AV systems, Control System, BMS Integration
Project Manager: Ted Leamy & Demetrius Palavos
Superintendent: Jim Kinkella & Jim Carmody
Web: www.packers.com/lambeau-field/

PROJECT OVERVIEW

Overwhelming growth in the fan base had stretched the field's capacity to its limits. The goal was to expand capacity and dramatically enhance the overall audience experience in every aspect of the facility. 

  • Architectural re-design included new technology for total update of audio/visual infrastructure 
  • Enclosed original horse shoe shape adding 7,000 seats to south end zone 
  • Added four premium club & back of house areas & two roof top party decks 
  • Added large Mitsubishi HD video boards in each end zone 
  • Added elevator banks in both end zones enhancing fan entry
  • Total audio systems upgrade included roof mounted, distributed loudspeaker system replacing original point source scoreboard loudspeaker for the main bowl
  • Dramatically improved audio performance and intelligibility throughout, especially south end zone where high winds adversely affected sound intelligibility.
  • Modern audio digital network with fiber installed as backbone of audio transport
  • Re-fit amplification system with modern remote controlled & monitored amplifiers, and signal processing, plus, digitally controlled audio mixing console
  • New digital audio network provides campus wide access to tap into and route audio from the control room to any area of the stadium
  • Project phased over 2010 - 2014 seasons, ensuring minimal disruption


510-741-2925
510-741-0790


CALIFORNIA

777 Arnold Drive
Suite 100
Martinez, CA 94553

COLORADO
7002 S. Revere Parkway
Suite 90
Centennial CO 80112

© 2020 ProMedia Audio & Video. All rights reserved.